Ad Light Group | Denver Water | ADA, Monument, Wayfinding
22302
portfolio_page-template-default,single,single-portfolio_page,postid-22302,stockholm-core-2.4.3,select-child-theme-ver-1.0.0,select-theme-ver-9.8,ajax_fade,page_not_loaded,,qode_menu_,wpb-js-composer js-comp-ver-7.6,vc_responsive
  • Exterior address sign at Denver Water
  • Monument directional exterior sign at Denver Water
  • Building B monument exterior sign at Denver Water
  • Interior sustainability informational sign at Denver Water
  • Interior wall mural by administrative services desk at Denver Water
  • Interior murals and informational panel at Denver Water
  • Interior wall graphic at Denver Water
  • Interior vinyl graphic on glass doors at Denver Water
  • Interior ADA room ID sign in building A at Denver Water
  • Custom wood Eleven Mile Canyon sign at Denver Water
  • Custom history timeline with vintage water pipes and informational panels at Denver Water

Denver Water

Ad Light Group partnered with Mortenson Construction, Stantec (formally RNL), and Iron Horse Architects to fabricate and install signage at Denver Water’s updated headquarters. The campus was under renovation between 2016 and 2020. The overall scope included large custom wall graphics, ADA signs, wayfinding signage, and exterior identification monuments for the updated facilities. A notable part of the project was Ad Light Group’s in-house design and fabrication of a custom Denver Water history timeline. The timeline features informational panels attached to vintage water pipes and is displayed in the Three Stones building.

Date

February 24, 2021

Category

ADA, Glass, Monument, Murals & Supergraphics, Wayfinding